we are confident to offer our consumers flexible and diversified services. We are aiming to fulfill the requires of the clients close to the entire world.. EPG was awarded with “popular solution of Zhejiang Province” and “famous brand of Zhejiang Province”.
YXL IEC Higher Efficiency Aluminum Frame Three Phase AC Electric powered Induction Motor Diagram S1 IC411 for fans pumps mixers conveyors food EPTs
———————————————————————————————
Applications: Can be utilized in the EPTs in which ongoing duty is necessary, normal purposes like
- Pumps
- Fans
- Reducing EPTs
- Conveyors
- EPT Equipment
- Farm Duty
- Meals Processing
- Production sector
- OEM and Re-sale (Distribution) markets, decreased bodyweight, quick availability and aggressive pricing
EPT Description
- Frame sizes: sixty three to 160M/L
- Rated output: .twelve to eighteen.5kW
- Voltage: 380V
- Frequency: 50Hz or 60Hz
- Poles: 2, 4, six, eight
- Efficiency stages: IE2
- Obligation Cycle: S1
- Enclosure: IC411 – TEFC
- Insulation class: F
- Degree of security: IP55/fifty six/65/sixty six
- Services Issue: one.
- Mounting: Flange, Foot
Features: EPTeautiful profile, substantial effectiveness and power preserving, lower sounds, little vibration, dependable working.
Optional Attributes:
Electrical:
Insulation Course:H
Thermal Protection: PTC Thermistor, Thermostat or PT100
Mechanical:
Other people mountings
Security Diploma:IP56, IP65, IP66
Sealing:Lip seal, Oil seal, Space Heater, Double shaft ends
Drain Hole
Mounting Variety:
EPT5 (Footless and EPT5 Flange Mounted)
Frame | Poles | Mounting Dimension | Overall Dimension | ||||||||||||
D | E | F | G | M | N | P | R | S | T | AC | Advertisement | HF | L | ||
63M | two,4 | 11 | 23 | 4 | 8.five | a hundred and fifteen | ninety five | a hundred and forty | four- Phi10 | 3 | a hundred thirty five | 112 | one hundred forty | 225 | |
71M | two,four,six | fourteen | 30 | five | 11 | one hundred thirty | a hundred and ten | a hundred and sixty | 4- Phi10 | three.five | a hundred forty five | one hundred twenty | one hundred sixty | 245 | |
80M | 2,four,six,eight | 19 | 40 | six | 15.five | 165 | one hundred thirty | 200 | four- Phi12 | three.5 | one hundred sixty five | a hundred thirty five | 245 | 295 | |
90S | two,four,6,eight | 24 | fifty | 8 | twenty | a hundred sixty five | one hundred thirty | 200 | 4- Phi12 | three.5 | 180 | a hundred forty five | 265 | 320 | |
90L | 345 | ||||||||||||||
100L | two,four,six,8 | 28 | sixty | 8 | 24 | 215 | a hundred and eighty | 250 | 4- Phi15 | four | 205 | one hundred fifty five | three hundred | 390 | |
112M | 2,4,six,8 | 28 | sixty | 8 | 24 | 215 | 180 | 250 | four- Phi15 | four | 225 | 180 | 315 | 420 | |
132S | two,4,six,8 | 38 | 80 | ten | 33 | 265 | 230 | 300 | 4- Phi15 | 4 | 270 | 205 | 370 | 465 | |
132M | 505 | ||||||||||||||
160M | two,four,6,eight | 42 | one hundred ten | 12 | 37 | 300 | 250 | 350 | 4- Phi19 | 5 | 320 | 240 | 435 | 605 | |
160L | 650 |
If there is no other request in the orEPTor arrangement, terminal box stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd place is at the rigEPT facet of the body information previously mentioned may possibly be modified with out prior notice.
Site
Display Room
Certificates
Premium Support
EPT Manage
EPT Motor Creation Workshop and Stream Chart
Hundreds of Certificates, honors and far more Organization data please go to quotAEPTOUT US quot
—————————————————————————————————————————
Welcome to make contact with us right…
https://youtu.be/frVvg3yQqNM
WANNAN MOTOR EPT Answers